Precision VRV Installation & Advanced HVAC Controls

Home » Precision VRV Installation & Advanced HVAC Controls

Subiaco WA

King Edward Memorial Hospital, North Metropolitan Health Service

Allen Air upgraded and installed a critical HVAC system for King Edward Memorial Hospital’s isolation rooms, delivering precise negative pressure control, advanced integration, and reliable, healthcare-compliant performance.

hospital hvac maintenance

Client

Subiaco WA

System Design by

Allen Air

Location

Subiaco North Metropolitan Health Service

Services

Commercial AC, VRV Installation and Controls

Critical HVAC Upgrade for Isolation Rooms, Subiaco, North Metropolitan Health Service

Allen Air was engaged to decommission, upgrade, and install a critical HVAC and VRV system servicing two isolation rooms at King Edward Memorial Hospital. These specialised rooms, along with their ante-rooms, required precise negative air pressure control to ensure effective disease containment and maintain safe air quality for hospital staff and patients.

Key Features of the Project:

  • Decommissioning & Upgrading – We carefully decommissioned the existing VRV system, replacing outdated components with a high-efficiency VRV system for the healthcare environment.
  • Advanced HVAC Controls – The system was interlocked with the air-conditioning system to maintain precise pressure regulation and secure access control.
  • Commissioning & Pressure Balancing – Following installation, our team calibrated the system to meet strict healthcare standards, ensuring seamless operation with minimal disruption to patient care.
Get started

Contact Our Team to Get Started

Ensure your business runs at peak performance; contact the premier HVAC and refrigeration service specialists.

This field is for validation purposes and should be left unchanged.